42’ x 48’ Driveway With Elevated Curbs & Drains

Customer requested a dummy grooved straight broom finish driveway with curbs. The curbs were poured with the slab for structural integrity. The curbs were stripped and broomed the same day.


This large driveway was completed in three pours (40 yards of concrete total). To direct the correct flow of water away from the house and garage, it had to be pitched just so, making more pitches than a baseball game. LOL! 


This project took a ton of thought regarding pitch and appropriate water drainage, as well as seeing through the fine-tuned aesthetic our customer had envisioned.